Power Generation Skip to Hydro Business Section
POPE & TALBOT |
| Nanaimo, B.C. |
|
| Value: $2,170,000 |
| Date: June, 2006 |
| Ian Brand (250) 722-4328 |
|
| Scope of Work: No. 4,5 & 6 Recovery Boilers, No. 9 Power Boiler, Dearator and Evaporator Repairs |
|
| CANFOR – NORTHWOOD PULPMILL |
| Prince George, B.C. |
| Value: $3,500,000 |
| Date: May, 2006 |
| Stuart Gairns (250) 962-3500 |
|
| Scope of Work: No. 1 & 5 Recovery Boiler, No. 2 & 4 Power Boiler, Evaporators and Misc. Vessel Maintenance. |
|
| CANFOR – PRINCE GEORGE PULP |
| Prince George, B.C. |
| Value: $510,000 |
| Date: March, 2006 |
| Brennan Leidal (250) 962-3825 |
|
| Scope of Work: No. 1 Recovery Boiler Retrofit |
|
| VICTORIA SHIPYARDS CO. LTD. |
| Victoria, B.C. |
| Value: $450,000 |
| Date: February, 2006 |
| Barry Walker (250) 380-1602 |
|
| Scope of Work: Repairs to Main & Auxiliary Port & Starboard Boilers (4) |
|
| AMEC AMERICAS LTD |
|
| Value: $265,000 |
| Date: March, 2006 |
| Jason Toews |
|
| Scope of Work: Piping Tie-ins |
|
| CARIBOO PULP AND PAPER |
| Quesnel, B.C. |
| Value: $270,000 |
| Date: April, 2006 |
| Tim Richards (250) 992-0296 |
|
| Scope of Work: Power Boiler and Evaporator Maintenance |
|
| CELGAR PULP COMPANY |
| Castlegar, B.C. |
| Value: $900,000 |
| Date: March, 2006 |
| Terry Moon (250) 365-4240 |
|
| Scope of Work: 2006 – Annual Repairs |
|
| VESTA GROUP |
|
| Value: $150,000 |
| Date: November, 2005 |
| Ajay Swamy |
|
| Scope of Work: Labour to Erect Windmills |
|
| SASKPOWER |
| Shand Power Station, SK |
| Value: $133,000 |
| Date: October, 2005 |
| M. Finnestad |
|
| Scope of Work: Radio Repeater Building |
|
| POPE & TALBOT |
| Mackenzie, B.C. |
| Value: $1,400,000 |
| Date: September, 2005 |
| Joe Reynolds (250) 997-2431 |
|
| Scope of Work: Annual Power, Evaporators, Precipitators, Miscellaneous Vessels and Lime Kiln Shell Replacement and Misc. Repairs |
|
| NORSKECANADA |
| Powell River, B.C. |
|
| Value: $1,960,000 |
| Date: July, 2005 |
| Ray Seguin (604) 483-3722 |
|
| Scope of Work: No. 19 Power Boiler Upgrade & General Maintenance |
|
| NORSKECANADA |
| Port Alberni, B.C. |
|
| Value: $630,000 |
| Date: June, 2005 |
| Jan Jowarski (250) 723-2161 |
|
| Scope of Work: No. 4 Power Boiler Annual Maintenance |
|
| POPE & TALBOT |
| Nanaimo, B.C. |
|
| Value: $1,500,000 |
| Date: May/June, 2005 |
| Ian Brand (250) 722-4328 |
|
| Scope of Work: No. 4 & 5 Recovery Boilers, No. 9 Power Boiler, Dearator and Evaporator Repairs |
|
| ABITIBI CONSOLIDATED |
| Mackenzie, B.C. |
|
| Value: $875,000 |
| Date: June, 2005 |
| Al Ankerson (250) 997-2800 |
|
| Scope of Work: No. 2 Power Boiler Annual Maintenance 2005 |
|
| GEORGIA PACIFIC |
| Wauna, Oregon |
| Value: $4,000,000 |
| Date: April/May, 2005 |
| Randy Warren (503) 455-3932 |
|
| Scope of Work: No. 1 Recovery Boiler Lower Furnace Replacement and Steam System Upgrades |
|
| CANFOR – NORTHWOOD PULPMILL |
| Prince George, B.C. |
| Value: $5,100,000 |
| Date: April/May, 2005 |
| Paul Rudecki (250) 962-3735 |
|
| Scope of Work: No. 1 & 5 Recovery Boiler, Evaporators and Misc. Vessel Maintenance which included Capital Work |
|
| US ARMY CORPS OF ENGINEERS |
| Cougar Dam, Oregon |
| Value: $500,000 |
| Date: October/November/December/January, 2004/2005 |
| Herve Dupas (514) 485-4263 |
|
| Scope of Work: Turbine & Generator Upgrades (2 units) - Reassembly |
|
| POPE & TALBOT |
| Nanaimo, B.C. |
| Value: $221,000 |
| Date: October, 2004 |
| Ian Brand (250) 722-4328 |
|
| Scope of Work: No. 1 & 2 Power Boiler Maintenance |
|
| POPE & TALBOT |
| Nanaimo, B.C. |
| Value: $75,000 |
| Date: October, 2004 |
| Ian Brand (250) 722-4328 |
|
| Scope of Work: No. 9 Power Boiler I.D. Fan Repairs |
|
| POPE & TALBOT |
| Mackenzie, B.C. |
| Value: $950,000 |
| Date: September, 2004 |
| Om Parmar (250) 997-2404 |
|
| Scope of Work: Annual Power, Evaporators, Precipitators, Miscellaneous Vessels and Lime Kiln Shell Replacement and Misc. Repairs |
|
| CANFOR – NORTHWOOD PULPMILL |
| Prince George, B.C. |
| Value: $450,000 |
| Date: September, 2004 |
| Ron Langille (250) 962-3689 |
|
| Scope of Work: No. 1 & 5 Recovery Boilers, Evaporator and Precipitator Maintenance |
|
| CANFOR – PRINCE GEORGE PULP |
| Prince George, B.C. |
| Value: $2,850,000 |
| Date: July/August/September/October, 2004 |
| Larry Greenwood (250) 962-3500 |
|
| Scope of Work: No. 1 Recovery Boiler Retrofit |
|
| POPE & TALBOT |
| Nanaimo, B.C. |
| Value: $1,200,000 |
| Date: May/June, 2004 |
| Ian Brand (250) 722-4328 |
|
| Scope of Work: No. 4 & 5 Recovery Boilers, No. 9 Power Boiler, Dearator and Evaporator Repairs |
|
| CANFOR – NORTHWOOD PULPMILL |
| Prince George, B.C. |
| Value: $390,000 |
| Date: May, 2004 |
| Paul Rudecki (250) 962-3735 |
|
| Scope of Work: No. 2 & 4 Power Boiler Annual Maintenance |
|
| US ARMY CORPS OF ENGINEERS |
| Cougar Dam, Oregon |
| Value: $500,000 |
| Date: October/November/December/January, 2004/2005 |
| Herve Dupas (514) 485-4263 |
|
| Scope of Work: Turbine & Generator Upgrades (2 units) - Disassembly |
|
| MONTENAY |
| Burnaby, B.C. |
| Value: $4,200,000 |
| Date: January, 2003 – June, 2003 |
| Colin Ritson (604) 521-1025 |
|
| Scope of Work: Power Boiler (3) Superheater and Pressure Part Installation, Turbine Generator c/w Associated Equipment Installation |
|
| EUROCAN PULP & PAPER CO. |
| Kitimat, B.C. |
| Value: $4,000,000 |
| Date: March, 2003 |
| Jerry Elkiw (250) 639-3559 |
|
| Scope of Work: Annual Recovery, Evaporator and Miscellaneous Vessel Shutdown Work Including Capital Repairs |
|
| POPE & TALBOT |
| Nanaimo, B.C. |
| Value: $1,800,000 |
| Date: May, 2003 |
| Ian Brand (250) 722-4328 |
|
| Scope of Work: No. 4 & 5 Recovery Boilers, No. 9 Power Boiler, Dearator and Evaporator Repairs |
|
| CANFOR – NORTHWOOD PULPMILL |
| Prince George, B.C. |
| Value: $475,000 |
| Date: May, 2003 |
| Paul Rudecki (250) 962-3735 |
|
| Scope of Work: No. 2 & 4 Power Boiler Annual Maintenance |
|
| VICTORIA SHIPYARDS CO. LTD. |
| Victoria, B.C. |
| Value: $270,000 |
| Date: June, 2003 |
| Barry Walker (250) 380-1602 |
|
| Scope of Work: Superheater Replacement c/w Drums – HMCS Protecteur, Auxiliary Boiler Repairs – HMCS Algonquin |
|
| POPE & TALBOT |
| Mackenzie, B.C. |
| Value: $1,300,000 |
| Date: September, 2003 |
| Om Parmar (250) 997-2404 |
| Ken Bonnell (250) 997-2459 |
|
| Scope of Work: Annual Power, Evaporators, Precipitators, Miscellaneous Vessels and Lime Kiln Maintenance |
|
| CANFOR – NORTHWOOD PULPMILL |
| Prince George, B.C. |
| Value: $500,000 |
| Date: September, 2003 |
| Ron Languille (250) 962-3689 |
|
| Scope of Work: “A” & “B” Side Evaporator Line Repairs Including Full Replacement of “A” Side No. 3 Effect |
|
| US ARMY CORPS OF ENGINEERS |
| Cougar Dam, Oregon |
| Value: $500,000 |
| Date: September - November, 2003 |
| Herve Dupas (514) 485-4263 |
|
| Scope of Work: Turbine & Generator Upgrades (2 units) - Dismantle |
|
| POPE & TALBOT |
| Nanaimo, B.C. |
| Value: $143,475 |
| Date: December, 2003 |
| Ian Brand (250) 722-4328 |
|
| Scope of Work: No. 9 Power Boiler I.D. Fan Repairs |
|
| DOMTAR |
| Windsor, PQ |
| Kvaerner Pulping Inc. |
| Value: $4,000,000 |
| Date: September, 2003 – October, 2003 |
| Dave Smith (604) 730-4302 |
|
| Scope of Work: Recovery Boiler Lower Furnace Replacement |
|
| WEYERHAEUSER |
| Dryden, Ontario |
| Value: $95,000,000 |
| Date: March, 2002 – November, 2003 |
|
| Scope of Work: Recovery Boiler, Precipitator and Associated Equipment Installation |
|
| VICTORIA SHIPYARDS |
| Victoria, B.C. |
| Value: $500,000 |
| Date: March 2002 – April 2002 |
| Barry Walker (250) 380-1602 |
|
| Scope of Work: Superheater replacement and miscellaneous repairs on Power Boilers (Port and Starboard) |
|
| POPE & TALBOT |
| Nanaimo, B.C. |
| Value: $1,700,000 |
| Date: April, 2002 |
| Ian Brand (250) 722-4328 |
|
| Scope of Work: No. 4 & 5 Recovery Boilers, No. 9 Power Boiler, Dearator and Evaporator Repairs |
|
| CANFOR – NORTHWOOD PULPMILL |
| Prince George, B.C. |
| Value: $400,000 |
| Date: August, 2002 |
| Pamela Woyciehouski (250) 962-3753 |
|
| Scope of Work: No. 2 & 4 Power Boiler Annual Maintenance |
|
| EUROCAN PULP & PAPER CO. |
| Kitimat, B.C. |
| Value: $1,800,000 |
| Date: August, 2002 – September, 2002 |
| Jerry Elkiw (250) 639-3559 |
|
| Scope of Work: Annual Recovery, Power, Evaporator and Miscellaneous Vessel Shutdown Work |
|
| POPE & TALBOT |
| Mackenzie, B.C. |
| Value: $1,750,000 |
| Date: September, 2002 |
| Om Parmar (250) 997-2404 |
|
| Scope of Work: Annual Recovery, Power, Evaporators, Precipitators and Miscellaneous Vessel Shutdown Work |
|
| BOWATER INC. |
| Thunder Bay, Ontario |
| Andritz Ahlstrom |
| Value: $2,600,000 |
| Date: July 2001 – Sept 2001 |
| Clint Thompson Andritz Ahlstrom. |
|
| Scope of Work: Mechanical erection of Boiler Pressure Parts for an existing Recovery Boiler. Components of the Recovery Boiler rebuilt were the Superheater and Roof Tubes |
|
| BOWATER Inc. |
| Thunder Bay, Ontario |
| Andritz Ahlstrom |
| Value: $1,500,000 |
| Date: January 2000 – June 2001 |
|
| Scope of Work: Construction Management Services for a Recovery Boiler installation. |
|
| BOWATER Inc. |
| Thunder Bay, Ontario |
| Andritz Ahlstrom |
| Value $20,000,000 |
| Date: August 2000 – May 2001 |
| Clint Thompson (Andritz Ahlstrom) |
|
| Scope of Work: Mechanical Erection of the Boiler Pressure Parts, Concentrators, Non-Pressure Parts and associated Piping for a Recovery Boiler. |
|
| WEYERHAEUSER |
| Prince Albert, Saskatchewan |
| Kvaerner Pulping Inc. |
| Value: $2,500,000 |
| Date: June, 1999 – July, 2000 |
| Jim Lamon (Kvaerner) |
| Mike Patterson (Weyerhaeuser) |
| Gary Beachman (Weyerhaeuser) |
|
| Scope of Work: TG Installation |
|
| WEYERHAEUSER |
| Prince Albert, Saskatchewan |
| Kvaerner Pulping Inc. |
| Value: $7,000,000 |
| Date: January 2000 – July 2000 |
| Jim Lamon (Kvaerner) |
| Mike Patterson (Weyerhaeuser) |
| Gary Beachman (Weyerhaeuser) |
|
| Scope of Work: Demolition of the Recovery Boiler and associated Precipitator and the Mechanical Erection of the BFB Boiler Pressure Parts and Non-Pressure Parts for the retrofit of a Recovery Boiler to a Bubbling Fluidized Bed Power Boiler. |
|
| WEYERHAEUSER |
| Prince Albert, Saskatchewan |
| Value: $10,000,000 |
| Date: April 1998 – July 2000 |
| Mike Patterson (Weyerhaeuser) |
| Gary Beachman (Weyerhaeuser) |
|
| Scope of Work: Construction Management Services for the installation of a Recovery Boiler and the retrofit of a Recovery Boiler to a Bubbling Fluidized Bed Boiler. |
|
| KIMBERLY CLARK |
| New Glasgow, Nova Scotia |
| Ahlstrom Machinery Inc. |
| Value: $7,000,000 |
|
| Scope of Work: Mechanical Erection of Pressure Parts for a retrofit of an existing Recovery Boiler. Components of the Recovery Boiler that were rebuilt were the Generating Bank, Lower Furnace, Superheater and Roof Tubes. |
|
| COMINCO LTD |
| Trail, BC |
| Value: $525,000 |
| Date: March – April 1999 |
| John Barr (250) 364-4222 |
|
| Scope of Work: Retrofit of the #7 Slag Fuming Boiler. The work consisted of the installation of a new Convection Bank, the retrofit and installation of fifteen new Sootblowers, the supply and installation of Piping and Tie-Ins for the Sootblowers and the removal and reinstallation of the Insulation and Cladding. |
|
| FLETCHER CHALLENGE CANADA INC. |
| Crofton, BC |
| Value: $800,000 |
| Date: November 1998 |
|
| Scope of Work: Generating Bank Tube Replacement. |
|
| MACMILLAN BLOEDEL LTD. |
| Powell River, BC |
| Value: $250,000 |
| Date: Two outages in 1998 |
|
| Scope of Work: Power Boiler Semi Annual Maintenance. |
|
| MACMILLAN BLOEDEL LTD. |
| Powell River, BC |
| Foster Wheeler – Pyropower |
| Value: $15,000,000 |
| Date: February 1997 – November 1997 |
|
| Scope of Work: The erection of all Pressure Parts, Non-Pressure Parts and ancillary piping relating to a Bubbling Fluidized Bed Boiler Installation and an Electrostatic Precipitator. |
|
| DONOHUE PAPER |
| CLERMONT, QC |
| Value: $3,000,000 |
| Date: 1995 |
|
| Scope of Work: This project was the erection of a new Pyro Power fluidized bed power boiler. |
|
| DOMTAR INC. |
| LE BEL SUR QUEVILLON, QC. |
| Ahlstrom |
| Value: $1,300,000 |
| Date: October, 1993 |
|
| Scope of Work: This project was for the installation of a new Recovery Boiler Air System designed and supplied by Ahlstrom |
|
| PH GLATFELTER |
| SPRING GROVES, PENNSYLVANIA, USA |
| Ahlstrom |
| Value: $7, 500,000 |
| Date: 1992 |
|
| Scope of Work: Performed the EPC assembly and erection of the new No.3 Recovery Boiler at the spring groves site. |
|
| NOVA SCOTIA POWER |
| POINT ANCONI, NOVA SCOTIA |
| Pyro-Power |
| Value: $12, 600,000 |
| Date: 1991 |
|
| Scope of Work: Erection of a new Circulating Fluidized Bed Boiler and auxiliary equipment. This was a CFB Steam Generator of 165MW in Cape Breton using local |
| |
| Hydro Business |
 |
Hydro-Québec: |
| Virginia, USA |
| Repair of a turbine generator unit |
|
|
 |
G.E. Hydro: |
| Massena, USA |
| Repair of an alternator, rotor part, replacement of poles and stacking |
|
|
 |
Hydro-Québec: |
| Outarde-3 |
| Major repair of the Outarde-3 evacuator, including on-site machining of doors and bedded parts |
| Value: 3.5 M |
|
|
| Hydro-Québec: |
| Rapide-des-Quinze |
| Mechanical repair of the waterworks intake and of the evacuator |
| Value: 9 M |
|
|
| Brascan Énergie: |
| Dufferin |
| Repair and manufacture of gate and hoist |
| Value: 1.2 M |
|
| Ministry of the Environment |
| Morin Dam |
| Design, manufacture and installation of two sets of heated and remote controlled dam doors |
| Value: 1 M |
|
| Hydro-Québec: |
| Grand-Mère |
| Installation of a half-gantry crane |
| Value: 200,000 |
|
| Brascan Énergie: |
| High Falls Power Plant |
| Manufacture and installation of a suction gate |
| Value: 100,000 |
|
| Boralex: |
| Bird Dam |
| Manufacture and installation of 5 drainage doors |
| Value: 600,000 |
|
| Hydro-Québec: |
| Garneau Falls – Arnaud Bridge |
| On-site repair of drainage gates and hoists |
| Value: 450,000 |
|
| Brascan Énergie: |
| High Falls Power Plant |
| Repair of bulkhead gates in the workshop |
| Value: 160,000 |
|
| Brascan Énergie: |
| High Falls Power Plant |
| Repair of embedded parts of the spillway, including on-site |
| machining |
| Value: 2.3 M |
|
| Brascan Énergie: |
| High Falls Power Plant |
| Manufacture and repair of embedded inlet gates and hoists, |
| including manufacture of a new gate |
| Value: 600,000 |
|
| Hydro-Québec: |
| Beauharnois |
| On-site repair of debris trap guides |
| Value: 1.5 M |
|
| Hydro-Sherbrooke: |
| Magog |
| Repair of the 2nd turbine generator unit, including the replacement |
| of the gate gear |
| Value: 500,000 |
|
| Hydro-Gatineau: |
| Château d’eau |
| Repair of a turbine generator unit, including the replacement of the |
| gate gear and upper floor |
| Value: 300,000 |
|
| G.E. Hydro: |
| Italy |
| Technical assistance for disassembly and reassembly of a turbine |
| generator unit |
|
| G.E. Système: |
| St-Timothée |
| Complete installation of a variable-frequency transformer. |
| Joint pilot project with HQ, GE and Kamtech |
|
| G.E. Hydro: |
| Oregon, USA |
| Complete disassembly and reassembly of two turbine generator |
| units |
| Value: 2.5 M |
|
| Brascan Énergie: |
| High Falls Power Plant |
| Repair of cavitation on waterwheel |
|
|
| |
|
|